Project Category A and B Fit Out at 20 Fenchurch Street
Project Team Cushman & Wakefield LLP (Architect, Contract Administrator & Building Services Engineers)
Shore Engineering (CDM Co-ordinator)
ISG Fit Out Limited (Main Contractor)
Client Tokio Marine Kiln Insurance Services Ltd
Primary Category Fit Out
Category
Commercial Fit Out Education
Public Buildings Historic Buildings Special Projects
Hotels Leisure & Performing Arts Residential

Services Offered
Project Management Quantity Surveying Building Services / Cost Management
Contract Admin Fire Insurance Reinstatement Cost Assesment Litigation Support
Project Monitoring Construction Consultancy Risk Management

Summary High quality Category A and B fit out at 20 Fenchurch Street (The Walkie Talkie Building)
Project Detail
Fanshawe were Quantity Surveyors on this prestigious fit out for Tokio Marine Kiln Insurance Services Limited at 20 Fenchurch Street (known informally as The Walkie Talkie building) in the inurance district of the City of London.  The Contract Works comprised a fit out to Category B from shell and core.
The Category A and B fit out provided approximately 80,000 sq ft of office accommodation spread over five floors.  This incorporated facilities for three separate parts of the business and also the creation of a demise wall and corridor to enable half of one floor to be occupied by a separate tenant at a later date. 
Three floors comprised largely open plan office areas with typical office facilities (informal meeting rooms, open plan and cellular offices, tea points, copy points, SERs and the like).  A further floor was used primarily for the Client's formal meeting rooms but also incorporated the main reception, catering facilities, additional supaloos, general office areas (workstations) and a small area for a separate part of the business.  The final floor of the fit out (including the demised area for a future tenant) was occupied solely by a third separate area of the business including its own reception, MER and break out spaces, together with typical office accommodation.
As part of the works the Contractor carried out the fit out of the lift lobbies and also provided additional facilites into the toilets previously completed as part of the shell and core contract.
The Main Contractor completed the project in an overall programme of 30 weeks under a JCT Standard Building Contract Without Quantities.  This included Contractor Designed elements and also incorporated Sectional Completion for the MERs (completed 12 weeks prior to Practical Completion), for the main construction works (completed 6 weeks prior to Practical Completion) and for the final IT and AV fit out.
Works were completed on time and within Tokio Marine Kiln's budget.
Please also refer to the Client Testimonial Letter included under "Project Download".

Value £11.8 million
Show Value Yes
Completion November 2014
Main Image  Download me! Main Picture.jpg Download
Image 1  Download me! Picture 1.jpg Download
Image 2  Download me! Picture 2.jpg Download
Image 3  Download me! Picture 3.jpg Download
Download  Download me! Kiln.pdf Download
Date Posted 30 Nov 2014
Archive Date 30 Nov 2024
Creation Date 04 Feb 2015
Modification Date 24 Jun 2015

Back to Projects

URL:  http://www.fanshawe.co.uk/metadot/index.pl?iid=2801
Printed on:  December 14, 2018 6:59 PM